Reduced Intervention Dissolvable Bridge Plug
Form: Customizable
Dissolution rate: Adjustable by alloy design and test condition
Documents:CNAS Inspection/ COA/COC available.
- Product Description
Reduced Intervention Dissolvable Bridge Plug
Hagrien's Reduced Intervention Dissolvable Bridge Plug delivers enterprise-grade zonal isolation for multi-stage fracturing operations. Our solution features pressure ratings up to 15,000 psi and operates reliably across 40°C–150°C temperature ranges. With controlled dissolution rates customizable to your reservoir conditions, you eliminate costly coiled tubing interventions. Backed by our vertically integrated manufacturing system—from Ø300 mm billet extrusion to precision machining—we guarantee consistent metallurgical performance, full batch traceability, and ISO 14310 V0-grade sealing integrity. Your completion efficiency increases while operational risk decreases.
What Makes This Technology Different
Traditional bridge plugs require mechanical mill-out. That means additional rig time, coiled tubing mobilization, and significant cost.
Our Reduced Intervention Dissolvable Bridge Plug changes that equation entirely.
You get reliable isolation during stimulation. Then the plug dissolves into harmless particulates when exposed to wellbore fluids. No mill-out. No intervention crew. No stuck pipe risk.
The magic lies in precision metallurgy. We formulate magnesium alloy compositions specifically for your fluid chemistry, temperature profile, and dissolution timeline. The result? Predictable degradation and a clean wellbore ready for production.
This isn't off-the-shelf commodity hardware. It's engineered downhole technology designed around your operating conditions.
Core Advantages You Can Count On
Faster Well Turnaround
Your completion schedule tightens when you eliminate mill-out operations. Stages complete faster. You move to production sooner. Time is money—especially when rig rates exceed $30,000 per day.
Application-Oriented Design
We don't force-fit standard products into your well. Our engineering team works with your data. We adjust alloy chemistry, structural geometry, and coating protocols to match your specific pressure, temperature, and fluid environment.
Lower Total Completion Cost
Coiled tubing mobilization alone can cost $50,000–$150,000 per well. Multiply that across a pad development. Our dissolvable solution eliminates that line item entirely while reducing HSE exposure.
Manufacturing Integration You Can Trust
Our closed-loop production system controls every step. From alloy melting through final machining, nothing leaves our facility without documented verification. You receive COA and COC documentation with every shipment. Batch traceability is standard.
Reduced Operational Risk
Extended-reach laterals present real challenges for mill-out operations. Helical buckling. Incomplete cleanout. Formation damage from circulation losses. Our Reduced Intervention Dissolvable Bridge Plug sidesteps these issues completely.
Technical Specifications
The Main Item Parameters | |||||||
Item No. | Casing Pipe | ID(mm) | OD(mm) |
Temperature |
Press Level |
OD of the ball(mm) | |
ID (In) | OD(In) | ||||||
HG-400 | 3.5 | 104.3-106 | 22.00 | 66.00 | 40℃-160℃ | 70 Mpa | 35.00 |
HG-400 | 4.5 | 104.3-106 | 40.00 | 88.00 | 40℃-160℃ | 70 Mpa | 50.00 |
HG-400 | 5.0 | 104.3-106 | 40.00 | 92.90 | 40℃-160℃ | 70 Mpa | 55.00 |
HG-400 | 5.5 | 114.3-116 | 35.00 | 87.90 | 40℃-160℃ | 70 Mpa | 55.00 |
HG-400 | 5.5 | 114.3-116 | 42.00 | 99.80 | 40℃-160℃ | 70 Mpa | 55.00 |
HG-400 | 5.5 | 114.3-116 | 45.00 | 102.50 | 40℃-160℃ | 70 Mpa | 55.00 |
H4-300 | 5.5 | 121.36-124.26 | 50.00 | 110.00 | 40℃-160℃ | 70 Mpa | 60.00 |
Where This Technology Excels
Extended Reach Drilling Operations
Ultra-long laterals push equipment limits. Coiled tubing can't always reach the toe section effectively. When you deploy our dissolvable plugs, you eliminate the reach limitation entirely. Every stage gets isolated. Every plug dissolves predictably.
High-Temperature, High-Pressure Reservoirs
Deep gas wells demand robust materials. Our magnesium alloy body maintains structural integrity under extreme thermal cycling. You get V0-grade sealing during stimulation, followed by controlled dissolution in post-frac conditions.
Depleted and Low-Pressure Formations
Mature fields often lack sufficient hydrostatic pressure to circulate out milling debris. Conventional interventions risk formation damage through fluid loss. Our solution leaves a clean wellbore without circulation requirements.
Offshore and Remote Locations
Logistical constraints make intervention operations exponentially more expensive offshore. Reducing or eliminating post-frac interventions directly impacts your project economics. Every avoided mobilization saves significant capital.
Quality Control That Protects Your Investment
We understand what's at stake. A plug failure during stimulation can cost hundreds of thousands in remediation.
That's why our quality protocols are non-negotiable:
Material Composition Analysis: Optical Emission Spectroscopy verifies precise alloy chemistry for every production batch. Consistency isn't hoped for—it's measured.
High-Temperature Pressure Testing: We simulate your downhole conditions in our CNAS-accredited laboratory. Every plug design undergoes hydrostatic testing to validate gas-tight sealing.
Dissolution Rate Verification: Documented degradation curves in simulated wellbore fluids ensure your cleanup timeline is predictable, not theoretical.
Ultrasonic Testing: Our UT inspection identifies internal defects or porosity before machining begins. Defective material never becomes a finished product.
Dimensional Inspection: Casing compatibility is verified through precision measurement. Your plug will set correctly at depth without premature activation during run-in.
Engineering Support Throughout Your Project
You're not just buying hardware. You're partnering with a manufacturing-driven engineering team.
We respond to RFQs within 24 hours. Detailed quotations follow within 1–3 business days.
Need prototype development? We transition smoothly from concept to scaled production. Our material-plus-structural co-design approach reduces your trial-and-error costs significantly.
Weekly project updates align with North American business schedules. Our U.S. coordination team ensures communication never becomes a project bottleneck.
Frequently Asked Questions
Q: How does fluid salinity affect dissolution performance?
A: Higher chloride concentrations accelerate galvanic corrosion. For low-salinity environments, we employ specialized freshwater-dissolvable alloy formulations or salt-pill activation systems. We design the solution around your produced water chemistry.
Q: What happens if actual well temperature runs cooler than predicted?
A: Lower temperatures slow reaction kinetics. In these scenarios, an acid soak or increased brine concentration catalyzes the dissolution process. We provide contingency protocols with every deployment.
Q: Are dissolution byproducts safe for the formation?
A: Absolutely. The plug degrades into microscopic metallic oxides and salts that are non-damaging and flow-compatible. These particulates are significantly smaller than formation pore throats and cause no productivity impairment.
Q: Can I use standard wireline setting tools?
A: Yes. Our plugs are designed for compatibility with industry-standard E-4 and hydraulic setting tools. No specialized deployment equipment is required.
Q: How do you ensure plugs don't degrade prematurely during storage or run-in?
A: Specialized coating technology prevents atmospheric oxidation and premature wellbore exposure. Vacuum-sealed packaging with desiccant maintains shelf life up to 24 months. Coating integrity is validated through accelerated aging tests.
Q: What documentation supports supplier qualification audits?
A: Every shipment includes Certificate of Analysis, Certificate of Conformance, and Safety Data Sheets. Full batch traceability and inspection records are maintained for audit readiness.
Why Hagrien Manufacturing Makes the Difference
Seven years of continuous production experience since 2019 means we've solved the problems other suppliers are still discovering.
Our vertically integrated facility controls every critical process step. We're not assembling components from multiple vendors. We're melting alloys, extruding billets, and machining finished tools under one quality system.
That integration delivers consistency you can build completion programs around.
Standard products ship in 2–4 weeks. Customized solutions in 4–8 weeks. Expedited delivery is available when your project timeline demands it.
We maintain safety stock for standard sizes because your operational schedule shouldn't wait on our manufacturing calendar.
Start Your Evaluation Today
Contact cyrus@us-hagrien.com to discuss your next project for Reduced Intervention Dissolvable Bridge Plug.
_1776908283214.jpg)



